Fatikchhari-Lakshichori connection road In 2007, no reform was done without carpeting

0
428

 

Chittagong reporter:
The Fatikchhari-Lakshichhari Upazila connection road has become ineligible due to lack of reform. The road connecting the two upazilas was carpeted in last 2007. Although its long years have passed, sometimes the road has not seen the road of reform without holes filled.
The only connecting road along the Lakshichori upazila headquarters of the Khagrachari Hill area in the adjoining Khagrachari Hill area near Manikpur in the north of Rangamatiya, Khalir shop, Kanchannagar UP’s Eastern Kanchannagar, and the road starting from the front of the Fatikchhari Upazila Parishad. The long 16 km road under the LGED is 13 km. Fatikchhari part and rest is under the control of Lakshichori upazila. But 13 km inside of Fatikchari 3km in the street Road is not good at present. The traffic is constantly being carried out at the risk of huge number of khanakhand roads. However, thousands of people from two upazilas were forced to move the road every day. There is no end to the suffering of students studying in school and college. In past floods, some of the roads were broken. The carpeting of the road has gone up and many holes have been created in different places. Kanchannagar UP Chairman Rashid Uddin Chowdhury Quayb said that he has assisted in maintaining normal movement of vehicles by breaking bricks in these harmful parts at their own expense. He has demanded speedy reform of the road. LGED’s Fatechchhari Upazila Engineer Md. Asked to know about Shah Alam, he said that if the allocation has been sent to the ministry earlier in order to provide the necessary allocation for the reform of the road, the road will be repaired.

LEAVE A REPLY

Please enter your comment!
Please enter your name here